Changelog
Ce qu'on a livré.
Notes de version publiques. On ne livre pas tant que ce n'est pas stable.
Changelog
Notable user-visible changes to Continuum. Newest first.
2026-05 — Phase 10: Integrations + Phase 11: Polish
- Integrations directory at
/settings/integrations— connect Buffer / Postiz / Metricool / LinkedIn / X / Instagram / Facebook / Google Calendar / Outlook / Plaid / Truelayer / Mono / bank-CSV / Postmark-inbound. Each connection's config is encrypted at rest. - Webhook log at
/settings/integrations/webhooks— see every inbound webhook with signature + status + attempts. - Marketing pages —
/pricingwith three plans (Solo / Team / Studio) and this changelog page. - i18n integrity check — a
pnpm i18n:checkscript that fails on key drift betweenenandfrlocales.
2026-04 — Phase 9: Owner dashboard
- Owner dashboard at
/dashboard— KPI tiles for outcomes / throughput / activity, runway tiles with traffic-light colour, monthly revenue bar chart, cycle-time tables, hours-planned-vs-done capacity bars. - Date-range picker — 7d / 30d / quarter / year presets + a custom range.
2026-03 — Phase 8: Team admin
- Audit log viewer at
/settings/team/audit— filter by module, verb, actor, date. - Roles × permissions matrix at
/settings/team/roles— read-only table of the 7 default roles × 47 permissions. RequirePermissionwrapper — disables actions the active session can't run, with a Tooltip explaining the missing permission.
2026-02 — Phase 7: Customer feedback
- Triage form at
/feedback— 4 buckets (Complaint / Suggestion / Question / Noise) with conditional severity prompt. - Complaints registry with the Acknowledge → Resolve loop enforced visually.
- Suggestions registry grouped by theme, descending by vote count.
- Auto-merge banner when the backend deduplicates a new suggestion into an existing record.
2026-01 — Phase 6: Content
- Content calendar at
/content— week view of scheduled posts. - Markdown draft editor at
/content/drafts/[id]with per-platform character limits. - Pillars + channels CRUD for shaping the content strategy.
2025-12 — Phase 5: Finance
- 4-account dashboard with Profit-First splits (OPERATING / OWNER_PAY / TAXES / PROFIT).
- Append-only ledger with reverse-entry flow.
- Invoice builder with status pills + issue + mark-paid actions.
- Weekly cash split preview + execute.
- CSV bank import with staged-rows preview.
2025-11 — Phase 4: Sales pipeline
- 8-stage pipeline board with click-to-move (drag-and-drop deferred).
- Prospects directory with search.
- Won / Lost flow capturing amount + reason.
- Follow-up cadence strip for day 0/3/10/30/120.
2025-10 — Phase 3: Scheduler
- Today view as the daily home.
- Week grid with click-to-create blocks.
- Recurring template editor.
- Reminders inbox with status filter.
2025-09 — Phase 2: Process manuals
- Manual library with category + ready-to-delegate filters.
- Markdown editor + version history with optimistic-concurrency 409 banner.
2025-08 — Phase 0 + 1: Bootstrap + Auth
- Next.js 16 scaffold with Tailwind 4 design tokens + husky pre-commit/pre-push.
- Login, sign-up, business switch, refresh-on-cold-start auth flows.
- Dashboard shell — sidebar + topbar + theme toggle.